Blair lead the CAD team for this aquatic centre comprising a 25x8m lane pool, a 20x6m learn to swim pool, a free-form leisure and spa pool.
Blair co-ordinated the MWH drawings of civil, structural, HVAC, electrical and drainage components. The structure comprised of three chord space frame truss system, masonry block walls, insitu concrete and steel, and concrete composite floor system. He liaised closely with the architect team and their documentation throughout the project.